Installing SAFEON Power Purifier is easy because of the following steps and will take approximately 30-45 working days from start to finish.

Follow the steps given below:

1) You need to contact us.

2) Once we get your enquiry, we will set up a demonstration exclusively for you, so that you are able to understand our product and how it will protect from Electrical Hazards.

3) After the respective demonstration, and with your permission, our energy audit team will conduct an energy audit at your premises. This audit will help us in getting information about your electrical system and power consumption. With that information we will be able to customize our product according to your specific situation and needs.

4) Once we have conducted the energy audit, our technician will determine a total calculated load/power requirement.

5) With the help of the total calculated load, and after your approval we will install your customized SAFEON product.